Don't wait for the completion of the drawings! Start ordering from confirmed units before the entire BOM is completed. Next-generation BOM management that connects design and manufacturing and adapts to specification changes.
In the field of custom order production, the normalization of design changes and the time loss caused by the inability to proceed with arrangements until all drawings are complete are factors that pressure delivery times. When data is fragmented between design and manufacturing, the risks of arrangement errors and excess inventory also increase.
FUSE's "Bill of Materials (BOM) Management" function positions the BOM as the "hub of design and manufacturing," serving as the core of concurrent engineering that synchronizes agile arrangements and reliable change communication.
The most significant feature is the "line-item status management," which allows for advance arrangements (staggered arrangements) for confirmed units or parts without waiting for the completion of the entire BOM. This dramatically shortens lead times caused by waiting for long-lead-time parts. Furthermore, it enables smooth reflection and differential merging from the "E-BOM," which is accurate for estimates and design, to the "M-BOM," which is accurate for manufacturing. The system automatically detects differences in design changes, preventing communication lapses and arrangement errors between departments.
*For more details, please download the PDF or feel free to contact us.